Issue report by rakesh katipalli
Product
FileMaker ProVersion
12Description of the issue
HiI want to calculate the time elapsed since the last modified date. For example, if the last modified date of a record was 8/1/14 2pm and today is 8/8/14 2pm, then the new "time elapsed" field needs to display "7 days and 0 hrs" since the record was last modified.
Thanks in advance
Rakesh